Look into History
30th september 1901 (10th January 1902)The municipal power plant in Bratislava started operation. On the Main Square and Promenade, the first electric street lamps were switched on.
20th December 1921
The day on which ZSE’s first General Meeting was held.
1st June 1922
ZSE registered as a legal entity.
11th February 1942
ZSE put into operation the first 100 kV line between Trnava and Bratislava, together with 100/22 kV terminals.
7th December 1952
The first 110 kV international connection between Nové Zámky and Kisigmand (Hungary) was put into operation.
11th June 1970
ZSE’s VHV network was connected to the 400 kV national transmission system thus making electricity supply more reliable.
1st November 2001
After 55 years, ZSE became a joint-stock company again.
13th June 2002
Representatives of the Slovak government and the German E.ON Energie Group residing in Munich signed an agreement on transferring a 49% share in ZSE to E.ON Energie at a price of EUR 330 million.
5th September 2002
The 49% share in ZSE was transferred to E.ON Energie AG.
19th November 2003
The European Bank for Reconstruction and Development (EBRD) and E.ON Energie signed an agreement on selling a 9% share in ZSE.
16th December 2003
The 9% share of E.ON Energie AG in ZSE was transferred to the EBRD.
1st April 2004
» Printer friendly versionZSE harmonised its graphics with the graphic design of E.ON Energie and added the text “člen skupiny E.ON” (Member of the E.ON Group) to its logo.